Seven construction processes of steel structure workshop

Time:[2021-11-13]  Hits:2098

The main process flow of steel structure plant construction is as follows:

1. Construction setting out. According to the design requirements and drawing requirements, use theodolite and level for positioning. After determining the axis and elevation, confirm the position of steel frame footing.

2. Foundation embedded parts. Before foundation concrete pouring, the embedded bolts shall be fixed according to the size, and the embedded bolts shall be wrapped in advance to avoid pollution during concrete pouring. After the completion of concrete pouring, the concrete residue at the embedded anchor rod and screw port shall be cleaned in time.

3. Steel column hoisting. First, confirm the position of component lifting points and take protective measures. After lifting the steel column, align it close to the anchor bolt, align the mounting hole with the bolt, and then slowly put down the hook. After initial calibration, tighten the bolts.

4. Steel beam installation. After the steel column is rechecked, the steel beam shall be lifted and bound symmetrically at two points. When the datum face of steel beam and steel column is on time, butt joint adjustment and correction shall be carried out, and then fixed and connected.

5. Purlin installation. The purlin generally adopts the method of one hook and multiple lifting. The error is adjusted by moving the sample bar back and forth along the purlin, tightening and loosening the bolts, and finally fixed with bolts for correction.

6. Install wallboard. Start at the gable at one end and move on to the other. At the initial stage of construction, the operation platform shall be used for transition to ensure that the top plate is parallel and installed vertically through stay wire. It is best to form at one time and handle it with care to avoid scratching.

7. Workshop painting. First remove the stains on the metal surface, and then apply antirust paint. After the antirust paint is dry, start puttying. After the putty is completely dry, it shall be polished and leveled. Finally, apply anti phosphating primer.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美一区二区放荡人妇| 色综合天天综合网站中国| 亚洲天堂手机在线| 亚洲成人777| 三级黄色网络| 亚洲免费福利| 亚洲成人毛片| 色片免费在线观看| 欧美性导航| 亚洲成a人片在线观看88| 亚洲欧美日韩国产综合高清| 偷窥 国产 综合| 四虎影午夜成年免费精品| 日本成人三级| 夜夜久| 色综合天天综合网国产国产人| 热久久中文字幕| 欧美一级α片| 色综合久久98天天综合| 亚色网址| 青青青草视频在线| 人人做人人爽人人爱影视| 色黄网站aaaaaa级毛片| 亚洲欧美卡通成人制服动漫| 欧美一级高清片| 人人射人人干| 亚洲精品www| 亚洲一区二区三区在线观看蜜桃| 亚洲欧美日韩综合网导航| 午夜国产在线视频| 三及片在线观看| 特级一级毛片视频免费观看| 欧美日本一区二区三区| 亚洲一区二区三区视频| 一级a性色生活片久久毛片| 亚洲青草视频| 四虎精品视频在线永久免费观看| 午夜网站在线| 亚洲jizzjizz妇女| 亚洲国产精品成人精品软件| 一级a级国产不卡毛片|