日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > How to ensure the safe use of steel structure?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

How to ensure the safe use of steel structure?

Time:[2021-10-13]  Hits:2040

How to ensure the safe use of steel structure?

With the rapid development of factory buildings in China, steel structures are more and more widely used. As we all know, the application of steel structure in plant construction is very important. Therefore, the following problems must be paid attention to when storing and installing steel structures to ensure the safe use of steel structures.

1. The specification, steel number, quantity and material acceptance certificate number of the steel shall be indicated at the end of the steel.

2. When stacking in the open air, the site shall be flat, the height shall be higher than the surrounding ground, and there shall be drainage channels around.

3. During stacking, the back of the steel section shall be upward or outward as far as possible to avoid the accumulation of snow and water. There shall be a height difference between the two ends to facilitate drainage.

4. Before installation, the construction unit shall conduct special inspection on the product certificates, design documents and pre assembly records of parts, and recheck the dimensions of parts.

5. Appropriate connection mode shall be adopted for steel structure to make the node design consistent with the simplified structural calculation model.

6. When hoisting the steel structure, appropriate measures shall be taken to prevent excessive bending and torsional deformation, and washers shall be added to the contact part between the wire rope buckle and the member to prevent the member from being injured.

7. When the steel structure is in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

8. High altitude operators shall use tools, and spare parts shall be placed in the tool bag rather than thrown up and down

9. When working in rainy days, reliable anti-skid measures must be taken, and pay attention to lightning protection in thunderstorm season.

10. The weather conditions before construction are also optimistic, and it is forbidden to use winds of level 4 or above.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲日韩中文第一精品| 四虎影视免费永久在线观看| 武侠古典久久亚洲精品| 午夜在线| 性插网站| 欧美国产成人在线| 西西人体444www免费| 青青青青青操| 亚洲成人综合在线| 青青艹在线视频| 四虎影视永久在线| 我不卡手机在线观看| 亚洲精品乱无伦码| 午夜爽爽爽男女免费观看hd| 色综合久久98天天综合| 一本大道卡一卡二卡三视频| 天天噜天天噜噜在线视频| 欧美激情视频一区| 日韩精品第1页| 人妖另类重口免费观看| 四虎影免看黄| 西西人体444www免费| 亚洲免费视频网站| 亭亭五月天激情| 欧美精品做人一级爱免费| 亚洲综合黄色| 一级毛片完整免费版| 一级福利视频| 欧美久久综合性欧美| 日韩aa在线观看| 日本三级全黄| 一级黄色片夫妻| 日本精品一区二区三区在线视频一| 四虎影院成人| 亚洲精品第一国产综合野| 四虎在线观看视频| 青草久操| 欧美精品四虎在线观看| 四虎成人在线| 青草视频在线观看国产| 台湾久久|