Installation details that must be paid attention to in steel structure processing

Time:[2021-9-22]  Hits:2180

Installation details that must be paid attention to in steel structure processing

In the construction of steel structure engineering, there are many details to pay attention to, especially in the installation process. We need to carefully operate and inspect the steel structure before, during and after installation.

1. Before the installation of steel structure processing members, the quality of steel members shall be checked. In case of deformation and defects, the steel members shall be measured and corrected according to the engineering characteristics within the range of allowable deviation. For the welding of thick steel plate and dissimilar steel plate and the main process of high-strength bolt installation, the process test shall be carried out before installation, and the corresponding key points of construction process shall be prepared.

2. When the expanded assembly unit is used for installation, the strength and stability of steel members that are easy to deform shall be checked, and reinforcement measures shall be taken when necessary; During the comprehensive installation of steel members, it shall be divided into several independent units. After the installation of all steel members of each unit, a spatial stiffness unit shall be formed.

3. During steel structure processing, the columns, beams, roof trusses, supports and other main components of steel members shall be corrected and fixed immediately after they are installed in place. The steel members installed on the same day form a stable space system. During the installation and correction of steel structure, corresponding adjustment measures shall be taken according to the influence of external environment such as wind force, temperature difference and sunshine and welding deformation.

4. When using the installed steel structure to hoist other components and equipment, the consent of the design unit shall be obtained, the checking calculation shall be carried out, and corresponding measures shall be taken.

5. During steel structure processing, 70% of the contact surfaces of the nodes tightened according to the design requirements shall be close to each other. Check with a 0.3mm thick feeler gauge, and the sum of the insertable areas shall not be greater than 30% of the total contact jacking area; The edge clearance shall not exceed 0.8mm.

6. When installing high-strength bolts, the bolts shall freely penetrate into the holes and shall not be used as temporary installation bolts. At the same time, the installation of high-strength bolts shall be tightened in sequence, and shall be tightened outward in the order of the center of the bolt group, and the final tightening shall be completed on the same day.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 四虎影院wwww| 三级在线观看| 香港三级日本三级三级韩级2| 欧美高清在线不卡免费观看| 一级国产精品一级国产精品片| 四虎国产精品永久免费网址| 色天天综合久久久久综合片| 天天弄| 亚州欧美精品suv| 亚洲综合色一区二区三区另类| 日本成人不卡| 特一级毛片| 奇米影视狠狠久久中文| 欧美日韩中文| 一级毛片国产| 欧美亚洲国产一区| 香蕉97超级碰碰碰免费公| 亚洲国产精品一区二区九九| 青青网视频| 欧美一级日韩一级亚洲一级| 午夜欧美性视频在线播放| 青青操视频在线| 亚洲精品成人| 亚洲视频99| 日本动漫黄网站在线观看| 日本九九热| 日本a∨网站| 天堂成人网| 日韩在线中文| 四虎影视在线永久免费看黄| 日本在线观看www鲁啊鲁视频| 午夜在线视频一区二区三区| 日本成年免费网站| 亚洲欧美精品一区二区| 亚洲国产视频一区| 亚洲va中文字幕无码| 亚洲国产成人久久77| 亚洲欧美日韩中文字幕在线不卡| 丝袜毛片| 人人看人人玩| 亚洲乱码卡一卡二卡三永久|