日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2484

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲精品性夜夜夜| 亚洲国产精品久久| 亚洲精品人成网在线播放影院| 日韩欧美一区二区三区免费看| 色综合久久久久久888| 午夜伊人网| 亚洲不卡一区二区三区在线| 亚洲国产精品久久久久秋霞66| 天天综合网天天综合色不卡| 一级毛片免费毛片一级毛片免费| 欧美日韩中| 亚洲天堂2018av| 欧美日韩有码| 青草视频网站在线观看| 亚洲精品老司机福利在线播放| 青青青青草| 欧美日韩一日韩一线不卡| 日本大片成人免费网址| 婷婷综合久久中文字幕一本| 亚洲自拍小说| 欧美第四色| 午夜免费福利视频| 一级美国乱色毛片| 亚洲a级片| 亚洲成人第一页| 青青青在线视频播放免费| 亚洲好骚综合| 天天爽天天爽| 特级淫片波多野结衣| 一级毛片直接看| 欧美日韩一区二区三区麻豆| 奇米狠狠| 日韩激情无码免费毛片| 午夜日本一区二区三区| 亚洲欧美日韩国产综合久| 日本ab在线| 婷婷亚洲国产成人精品性色| 欧美一级免费看| 亚洲h在线观看| 台湾佬自偷自拍情侣在线| 青青草99|