日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > During the installation of steel structure, the following problems shall be paid attention to:
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

During the installation of steel structure, the following problems shall be paid attention to:

Time:[2021-8-28]  Hits:2637

During the installation of steel structure, the following problems shall be paid attention to:

1. Before the installation of steel structure, all members shall be comprehensively inspected, such as whether the number, length, perpendicularity of members and the size between bolt holes at installation nodes meet the design requirements; The defects generated during fabrication and deformation generated during transportation shall be corrected on the ground and properly solved.

2. The steel column and foundation are generally connected by embedded anchor bolts. Therefore, before installing the steel column, check the size between the column base bolts, whether the length exposed to the foundation surface, the elevation of the foundation top meet the design requirements, and whether the thread of the column base anchor bolt is damaged (generally, measures are taken during foundation construction to protect the column base anchor bolt and its thread from being damaged).

3. When hoisting the steel structure, proper measures shall be taken to prevent excessive bending and torsion deformation. The contact part between the rope buckle and the component shall be padded with cushion blocks to prevent the component from being damaged.

4. After the steel structure is hoisted in place, the support and other connecting members shall be fastened in time to ensure the stability of the structure.

5. The hoisting of all superstructure can only be carried out after the substructure is in place, corrected and fastened with supporting members.

6. Assemble a large installation unit on the ground according to the lifting capacity of the site installation machinery to reduce the workload of high-altitude operation.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲婷婷六月 | 国产精品亚洲一区二区麻豆 | 国产门事件xxx | 国产精品特黄毛片 | 亚洲天堂视频在线观看免费 | 久久精品99无色码中文字幕 | 香蕉伊思人视频 | 91亚洲国产成人久久精品网站 | 成品人app软件大全下载免费版 | 伊人网国产 | 青青草99久久精品国产综合 | 成人精品一区二区三区校园激情 | 2017亚洲天堂 | 亚洲一区二区免费视频 | 91福利精品老师国产自产在线 | 成人影片在线免费观看 | 狠狠夜夜 | 99久久免费国产精品特黄 | 色综合合久久天天给综看 | 日日摸夜夜夜夜夜添 | 国产成人欧美一区二区三区vr | 国产精品97 | 精品二区 | 插菊花网站| 日木毛片 | 色综合天天综合网站中国 | 久久久国产高清 | 日韩片在线观看 | 69精品在线观看 | 色偷偷伊人 | 五十路亲子中出中文字幕 | 一级毛毛片毛片毛片毛片在线看 | 91精品免费看 | 欧美国产亚洲一区二区三区 | 欧美精品高清 | 欧美专区在线 | 香蕉在线精品视频在线观看2 | 九九热爱视频精品视频高清 | 亚洲精品香蕉婷婷在线观看 | 国四虎影永久 | 狠狠干97 |