Steel structure workshop

Time:[2020-8-31]  Hits:3684

Transfer around the industrial park, you will find that many workshops have the impression of high, large and wide steel structure workshops. Most of the modern industrial workshops adopt the steel structure housing mode, which is better than the traditional brick and concrete building.

 

 


Steel structure workshop construction process steps

 

1.Land use permit. No matter at home or abroad, the first step of building workshop is to verify the land use right to ensure the legitimacy of housing construction.

 

2.Investigate the surrounding environment,topography and other factors, and communicate with customers to determine the preliminary design plan.

 

3.After the drawing is confirmed, the factory will arrange production. The whole production process is carried out on the industrial assembly line to ensure the unity of the steel structure and the quality of each part.

 

4.The processed steel structure will be transported to the construction site for erection, installation and final decoration. This "production build" construction mode greatly shortens the construction period, reduces the construction period and labor cost; in addition, it also reduces the construction waste on the construction site, which is in line with the social pursuit of energy conservation and environmental protection in modern life.

 

5.After the completion of construction, it will enter the final acceptance process. The relevant quality supervision department will carry out the construction acceptance of the steel structure workshop house, and finally carry out the delivery stage. From the above five links, it can be seen that the steel structure factory workshop has the advantages of "saving labor, saving money and heart, safety and environmental protection", and has become the preferred product for the construction of factories, warehouses, office buildings, gymnasiums, aircraft hangars, etc.

 

 

Quality problems are easy to occur in the process of processing and manufacturing, and it is difficult to deal with them after the occurrence of quality problems. The proportion of general process quality problems is very small.

 

Welding process

 

This process belongs to concealed engineering, and it is also one of the processes prone to quality problems. According to the statistics of product quality report of a company in 2004, the repair rate of welding seam caused by welding quality is as high as more than 80%, followed by the improper operation of the previous procedure and the technical problems of operators, accounting for about 10% It is the main problem that directly affects the quality of the project. Therefore, this type of problem must be detected and judged by professional testing company using professional testing tools. Generally, according to the type of defects in the weld, it can be divided into slag inclusion, undissolved, porosity, etc.

 

 

Painting process

 

This process is also a hidden process, the impact on the structure is less than the impact on the building function. It is also a process prone to quality problems. The quality problems of the process are mainly as follows: the paint film on the surface of the component falls off in large area and local area; the paint film on the surface of the component falls off and sags; the thickness of the paint film is not enough; the distribution of the film thickness is uneven; and the color difference of the paint film is large.

 

Assembly process

 

This process plays an important role in the quality of component processing, and its quality is greatly affected by the previous process, so it is very important to strengthen process monitoring before assembly. Generation of the process The main quality problems are as follows: the position of the assembled parts is wrong, for example, the assembly of 3450 mm is 4350 mm; the use of the parts is wrong, which should have been assembled with 2 pieces of parts, but the assembly of 3 parts; the assembly errors of parts in the correct position, such as the hole 45mm on the board originally faces outward, but the actual 45mm is installed inward; the assembly clearance of the assembled parts exceeds the specifications and technical documents Some parts are assembled without correction, and the existing deformation can not be eliminated after assembly; the operator cut privately for the convenience of the drawing, resulting in the size of the hole on the part exceeding the standard; the surface treatment of the welding area is not carried out; the assembly error is caused by the wrong size of the drawing paper.

 

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日日操天天操夜夜操 | 国产免费高清 | 成人伊人青草久久综合网破解版 | 韩国免费网站成人 | 香蕉视频亚洲一级 | 亚洲2020天天堂在线观看 | 日韩国产欧美一区二区三区 | 亚洲图片在线播放 | 一区二区三区四区五区六区 | 四虎影视在线免费观看 | 免费老色鬼永久视频网站 | 亚洲激情综合 | 久久996热精品xxxx | 女人18片免费视频网站 | 国产成人精品1024在线 | 国产综合91天堂亚洲国产 | 国产视频日本 | 国产精品黄在线观看免费 | 一区 在线播放 | 91久热| 欧美一区日韩一区中文字幕页 | 欧美成人a人片 | 插插好爽爽爽啊 | 中文字幕免费人成乱码中国 | 99香蕉国产精品偷在线观看 | 成人黄色在线视频 | 日韩成人影视 | 国产欧美日韩在线人成aaaa | 国产成人三级视频在线观看播放 | 亚洲国产一成人久久精品 | 91香蕉国产亚洲一二三区 | 日本成人不卡视频 | 四虎久久精品国产 | 国产精品一区二区在线播放 | 国产亚洲综合精品一区二区三区 | 国产热re99久久6国产精品 | 欧美高清一区二区 | 国产福利在线观看 | 在线一级片 | 毛片网站免费在线观看 | 天天摸夜夜添 |