As the fundamental Foshan steel construction, during construction only, must be applied with a series of measurements and each process, measurement solutions throughout the entire construction process of steel Foshan, Foshan steel construction preparations key First, through high-precision measurement and calibration accuracy of the installation of the steel member to the specified location to meet the accuracy requirements, therefore, after the preparation, the measurement is the most keywords point below Katsukuni steel to introduce the next General steel measuring program

 

First, the measurement and control of all construction work Surveying work required to be responsible for the construction and installation of steel structures, Foshan, with supervision engineers test measurements and all auxiliary work conditions

Second, before the project began, the elevation and coordinate reference point and measuring point provided by the chief engineer, but if you think the information provided by contractors when there are problems, engineers need to think reflect

Third, after receiving measurement reference point provided by contractors, precision measurement of the measurement reference point to go to school, and to review the accuracy of the information and data reference point, and to be reflected in writing Engineer

Fourth, the contractors provide a reference point for the word basis, according to national mapping standards and engineering precision requirements, the control center set engineering and engineers to review

V. baseline, anchor construction, accurate control points and point of construction, after a final measure to detect and measure the positioning point accuracy meets the construction requirements

Sixth, protect the measurement is completed reference point, the reference lines,

7. After the installation is complete Foshan steel, at the same time each day to determine whether the measurement Foshan deformed steel node data, corrected if necessary

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本黄色网址大全| 欧美高清一级| 色站综合| 视频一区在线| 青青草久久伊人| 天天做天天添天天谢| 日韩a在线播放| 日本中文字幕不卡在线一区二区| 人人看人人看人做人人模| 色无极在线| 三级全黄60分钟| 亚洲另类电击调教在线观看| 青青操网| 亚洲欧洲中文| 亚洲国产成人久久综合区| 色综合久久五月| 亚洲欧洲在线视频| 无码专区aaaaaa免费视频| 一级片视频免费看| 亚洲欧美日韩精品中文乱码| 日本免费一区二区三区a区| 人人看人人射| 色综合天天综合网站中国| 夜夜嗨影视| 亚洲精品网址| 亚洲免费视频一区二区三区| 四虎综合九九色九九综合色| 青草视频在线| 日韩精品视频美在线精品视频| 日韩精品免费一区二区三区| 日本中文在线视频| 午夜精品福利在线| 天天操综合网| 图片亚洲va欧美va国产综合| 亚洲精品永久免费| 青在线视频| 欧美日韩国产一区二区三区播放| 日韩3区| 一级毛片免费在线播放| 色国产在线| 日本一区二区三区久久精品|