日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Foshan three steel steel truss construction method
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4647

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美成人看片一区二区三区尤物| 欧美日韩 国产区 在线观看| 亚洲第一中文字幕| 欧美激情在线精品一区二区| 亚洲国产精品久久精品成人| 性夜影院爽黄a爽免费视| 日本最新新片在线观看免费| 四虎在线最新永久免费| 亚洲精品在线影院| 亚洲欧美在线观看| 青草资源站| 四虎影视在线麻豆国产| 亚洲高清heyzo加勒比| 亚洲美女高清aⅴ视频免费| 亚洲国产九九精品一区二区| 特级生活片| 青青青在线网站视频在线| 色天使亚洲| 日韩午夜免费| 日本网络视频www色高清免费 | 日韩精品亚洲专区在线影视| 青青热久久久久综合精品| 青青草综合网| 窝窝女人体国产午夜视频| 日韩h片在线观看| 亚洲国产日韩欧美| 亚洲免费中文| 天天艹天天艹| 亚州色吧| 手机在线看片国产日韩生活片| 亚洲视屏在线观看| 青青青久97在线观看香蕉| 欧美激情精品久久久久久不卡| 日本中文在线视频| 亚洲网站大全| 婷婷亚洲综合| 午夜视频福利在线观看| 亚洲国产成人久久99精品| 亚洲午夜国产片在线观看| 亚洲免费视频一区二区三区| 亚洲成人h|