Foshan three steel steel truss construction method

Time:[2016-6-11]  Hits:4796

A high-altitude assembly method
Steel truss assembly method by high-altitude installation, erection is first assembled bracket design position, and then use a crane to grid member sub-element (or block) to the design position hanging in the air, were assembled on the bracket. Sometimes this method does not need large-scale lifting equipment, but the bracket assembly large amount of aerial work more. Therefore, the high strength for steel pipe truss with steel production of steel truss or bolt ball node is more appropriate, there are still a number of steel truss construction method has been applied.

Second, the overall installation method
Overall installation method is to first grid on the ground assembled into a whole, and then lifting equipment designed to enhance its overall position to be fixed. This method of construction without assembling the bracket tall, aerial less easy to ensure the welding quality, but requires a large crane lifting equipment, technology is more complex. Therefore, this method of spherical joints steel grid (especially three-grid and other bars more grid) is more appropriate. Depending on the equipment used, the overall installation method is divided into multi-machine Hoisting method, pull the lever to enhance the law, law and jack lifting jack lifting method.

Third, the high-altitude sliding method
In recent years, the use of aerial roof truss construction by parallel sliding gradually increased, it is especially suitable for theaters, auditoriums and other projects. This method of construction, the grid assembly platforms are situated in the building lobby top plate assembly (erection can be assembled on the platform assembly auditorium bleachers), to be the first assembly unit (or first stage) assembly is completed, it is about to fall on the sliding track, traction equipment from sliding forward a certain distance. Then assembled on the platform of the second assembly units (or second), after a good fight, together with the first assembly unit (or first stage) with slip forward, so ask before slipping constantly assembled piecemeal, until the entire grid assembly is completed and moved to place the slide position.

Good slip assembly grid, the grid can be set up under the carriage wheel, the roller slide on the slide rail; also in the grid holder under the seat bottom, so embedded in the bearing plate along the reinforced concrete frame beam embedded steel slide.
Slip grid or lever hoist winch available traction. According to the lever bearing capacity and traction grid size between supports, may be one or more points of traction. When the grid slip ends sync value should not exceed 50mm.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲精品日本高清中文字幕 | 三级黄色视屏 | 欧美一区二区三区性 | 亚洲视频在线一区 | 久草资源在线 | 色综合视频| 国产亚洲精品成人久久网站 | 在线看免费观看韩国特黄一级 | 五月综合在线 | 91亚洲视频在线 | 四虎免费永久观看 | 国内精品久久久久久久久 | 日本亚州视频在线八a | 91社区在线视频 | 好爽毛片一区二区三区四 | 亚洲人成依人成综合网 | 四虎成人4hutv影院 | 天天做天天爱天天影视综合 | 国产美女精品 | 男人天堂亚洲天堂 | 日本视频在线免费播放 | 天天综合久久 | 成人激情站| 色xx综合 | 日韩大片免费在线观看 | 在线视频 日韩 | 成人欧美日韩视频一区 | 国产一区二区三区在线免费观看 | 色xx综合 | 午夜网站在线播放 | 国产在线精品一区二区 | 亚洲欧洲精品在线 | 66成人 | 亚洲精品嫩草研究院久久 | 成人在线色视频 | 榴莲app下载网站进入wym | 日韩精品一区二区三区四区 | 国产专区视频在线观看 | 欧美成人高清 | 久久久亚洲欧洲日产国码二区 | 国产a三级三级三级 |