日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Guangzhou Steel connection design element method
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

Guangzhou Steel connection design element method

Time:[2016-4-20]  Hits:3748

Guangzhou Steel connection design element method

 

Guangzhou Steel member steel connection design which has several methods? Guangzhou Steel industry experts will share valuable experience for everyone ~


  Practical design method, design accurate calculation method, commonly used to simplify the design and method of connecting equal strength design method.

A practical design method is based on the flange is connected to a net cross-sectional area of ​​the same strength spliced ​​connection, and web connections in addition to the effect of shear splice is calculated in the position, but still should be net web sectional area net shear Capacity 1/2 or member ends moment divided by the length of the cross member of the resulting shear is determined.

Second, the accurate calculation method is designed to be connected to the flange and web member proportional share their moment of inertia moment at the cross-section, while shear borne entirely by the web.

Third, the common simplified design method is to assume all the moments by member flange and the web to assume all of the shear splice design.

Fourth, equal strength design method is based on the condition of net cross-sectional area of ​​the flange is connected to the web or the like intensity to stitching. Seismic node design follows the principle of the force in addition to a clear reduction of stress concentration and ease of processing outside the installation, the most important thing is to satisfy the principle of strong weak connection member, to avoid leaving the connection is weak overall structure damage. Purposes strength design method is to make the connection with the carrying capacity of the member connecting member carrying capacity equal to or greater than the component capacity. So equal strength design method is often used to connect structural seismic design or by the design of elastoplastic member stitching design, to ensure the continuity member and have good ductility.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 欧美一区二区免费| 亚洲 欧美 成人日韩| 色婷婷5月| 青青青青爽极品在线视频| 欧美成人性色xxxxx视频大| 亚洲成a人v天堂网| 日本激情网站| 破外女出血一级毛片| 青青热久久国产久精品| 亚洲国产成人久久| 七七久久综合| 任我鲁这里有精品视频在线播| 日韩免费高清| 青青草原手机在线视频| 特级毛片aaaaaa蜜桃| 一本久道久久综合婷婷| 日本天堂免费a| 奇米久久| 亚洲人成亚洲精品| 四虎免费入口| 日韩一级在线视频| 一级黄色夫妻| 青青青视频免费线看 视频| 欧美韩日国产| 日韩成人一级| 亚洲精品免费视频| 四虎成人免费网站在线| 欧美激情二区三区| 青青青亚洲精品国产| 亚洲青涩在线| 亚洲视频不卡| 欧美性综合| 香港aa三级久久三级老师| 亚洲另类电击调教在线观看| 日本黄色激情视频| 青草青青在线视频观看| 亚洲欧美一区在线| 午夜国产大片免费观看| 色噜噜 男人的天堂在线观看| 亚洲天堂午夜| 亚洲国产一区在线观看|