日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Steel structure engineering foundation inspection General requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

Steel structure engineering foundation inspection General requirements

Time:[2016-3-2]  Hits:4552

Steel structure engineering foundation inspection General requirements

Guangzhou before the installation of steel structures to deal with the positioning axis, foundation and elevation axes, anchor bolt size and location of the building, etc. for review, and should be the foundation for the handover inspection and acceptance. Such as the need to review the bolt axis of each bolt, elevation that exceeds regulatory requirements, must take appropriate remedial measures. Such as increasing the size of the column bottom in the column base plate according to the actual drilling bolt position again.

Guangzhou Steel when foundation works in case of partial handover, handover acceptance each column base capable of forming at least a foundation degree space steel mounting unit, and should be consistent with the following provisions: foundation concrete strength to meet the design requirements; compacted backfill around the foundation end; bedrock elevation and symbolic reference axis point and accurate and complete; the top surface of the foundation should be flat, the foundation should look at the secondary irrigation cutting hair, anchor bolts should be intact.

The column axis position measured in column base outer shells.

The column base level for leveling. Pouring concrete column base elevation is generally reserved for 50 to 60 mm (compared with steel column base level design), the installation is a steel plate or early adoption sit pulp carrier plate leveling.

When using steel plate made of the support plate, the steel plate area should be based on lower compressive strength of concrete foundation, columns soles of the feet before the bottom of the column subjected to secondary grouting fastening bolt tension load and accounting determination. Pad in contact with the root surface and the bottom surface of the column should be flat, tight.

When the pulp should be used to sit for the board to shorten the no-mortar, mortar pads before lifting the column strength should be higher than a level foundation concrete strength and mortar pad area should be sufficient to meet carrier requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 五月综合激情| 天天操天天弄| 亚洲字幕久久| 欧美成人免费在线| 亚洲欧美久久精品一区| 三级黄色片免费观看| 一级片免费视频| 人人狠狠| 欧美激情国产一区在线不卡| 午夜a级理论片在线播放一级| 亚洲欧美日本在线观看| 亚洲综合精品一区| 日本三级影院| 欧美一级α片| 日本黄色免费在线视频| 亚洲国产综合在线| 亚洲国产欧美久久香综合| 婷婷三级| 亚洲国产系列久久精品99人人| 四虎图库| 青草视频久久| 日韩手机在线视频| 亚洲精品永久www嫩草| 亚洲精品6久久久久中文字幕| 欧美亚洲日本在线| 一级成人a毛片免费播放| 亚洲永久中文字幕在线| 青青成人福利国产在线视频| 欧美日韩加勒比一区二区三区| 亚洲国产成人精品91久久久| 天天网综合| 午夜日本福利| 色尼玛亚洲| 日产免费线路一页二页| 欧美极品jizzhd欧美| 色天天综合久久久久综合片| 亚洲三及片| 视频在线观看一区二区| 亚洲人成亚洲精品| 亚洲国产一区视频| 性做久久久久久蜜桃花|