日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Macau's first single large span reticulated shell steel structure engineering cap
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

Macau's first single large span reticulated shell steel structure engineering cap

Time:[2015-10-14]  Hits:4654

Guangzhou Steel News: Macau's first single large span reticulated shell steel structure engineering cap

Recently, MGM Cotai hotel project engineering sky cap. It is reported that the project is two-way bias diagonal saddle hyperboloid form a monolayer structure large span reticulated shell, is the first in Hong Kong and Macao regions.

Reporters learned that the project by the China Building World Group general contractor, China State Construction Steel Co., Ltd. is responsible for construction and deepening of the design, manufacture and install. Engineering is about 1900 tons of steel, the maximum span of 140 meters, the projection area of ​​nearly 1.5 standard football field.


The project design dynamic lightweight construction steel structure is necessary to ensure that "no weight overruns," but also "the body strong enough." How to root after more than 5,000 bars and non-standard sizes like 1500 nodes personalized design and production of combines is a not a small problem, it is built in steel design staff, they repeatedly conducting research , from the cellular to be inspired, creative use of external double hollow hexagonal prism nodes form a useful structure to reduce the weight of a quarter, and is configured to connect stable. In the production chain, the project also "experience" to a lot of difficulty. Steel engineering project by each node 6 sizes totaling 48 parts board group fight together in diameter from 40 centimeters to 100 centimeters, the number of welds from 40-50, built in steel production staff He said welding this node is simply in embroidery, but by concentric positioning optimization, weld optimization and other measures, useful for the production of precision error strictly controlled within the requirements of British Standard Specification 3 mm. In the apparatus of the process, the use of point-in support system in a small space to ensure the load path clear, while using three-dimensional coordinates of the law means good control precision by 144 support points. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 性色综合| 一级毛片免费不卡在线| 日韩一级在线| 特别毛片| 奇米狠狠| 欧美日本一区二区三区| 啪啪.com| 日日夜人人澡人人澡人人看免| 欧美精品亚洲精品日韩| 欧美成人三级网站在线观看| 亚洲伊人久久在| 婷婷在线成人免费观看搜索| 色综合久久久久久久久五月性色| 思思99re热| 亚洲97i蜜桃网| 青青久久国产| 亚洲一级免费视频| 日韩在线一区视频| 亚洲精品国产第1页| 欧美日韩永久久一区二区三区| 香蕉久久久久久狠狠色| 亚洲一区影院| 三级黄色a| 欧美亚洲香蕉| 青草免费在线观看| 天天拍拍天天爽免费视频| 欧美高清亚洲欧美一区h| 亚洲综合sss久久天堂| 日本jizz在线播放| 午夜免费福利在线| 亚洲欧美日韩精品专区卡通| 亚洲精品综合在线| 欧美日b视频| 欧美操| 亚洲国产精品一区二区九九| 欧洲色综合| 人妖chinesetscd在线| 香蕉狠狠干| 青青青青青操| 一级毛毛片| 偷窥福利视频|