日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > 1. Steel parts and steel components processing requirements
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

1. Steel parts and steel components processing requirements

Time:[2015-2-28]  Hits:4613

1. Steel parts and steel components processing requirements:
  Cutting surface or cut surface of steel, should be no cracks, slag, stratification and greater than 1 mm of missing edge, should fully checked.
Carbon structural steel at ambient temperature is below -16 ℃, low-alloy structural steel at ambient temperature is below -12 ℃, not cold cold bending and straightening.
Steel surface after the correction, there should be a clear concave or damage, scratches depth of not more than 0.5mm, and should not be greater than the thickness of the steel allows negative deviation 1/2.

2. Steel welding requirements:
  (1) Welder
  Engaged in steel welders welding work must obtain a certificate and pass the examination. Welders welding must pass the examination within its scope the project and recognized.
  (2) Non-destructive testing
  Design requirements for full penetration of the primary and secondary weld ultrasonic testing should be used to check the internal defects, ultrasonic testing can not judge when the defect should be used radiographic inspection, and testing its internal defect classification methods should be consistent with existing national standards regulations.


3. Fasteners Requirements:
  Steel production and installation of units should be required strength bolts were even anti-slip friction coefficient test and retest the surface, the friction surfaces of the scene should be a separate component for anti-slip coefficient test results should meet the design requirements.


4. Steel and steel component assembly installation requirements:
  (1) H-beam flange plate welded seam and web seam spacing of not less than 200 mm.
  (2) cranes and crane girder trusses in place after installation should not be under the scratch.
  (3) multi-section column installation, locate the axis of each section of the column should be drawn directly on the ground to control the axis, the axis must not lead from the lower column, to avoid excessive accumulation of errors.
  (4) After completion of the steel truss structure and the overall fight after completion of the roof should be separately measured deflection, deflection, and the measured value shall not exceed 1.15 times the corresponding design values.
  (5) paint, painting several times, coating thickness shall meet the design requirements.
  (6) a thin coating fireproof paint coating thickness shall comply with the relevant requirements of the fire resistance design.


5. Steel Division project completion and acceptance requirements.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 一级毛片免费一级直接观看| 热线视频在线观看| 亚洲国产精品综合久久久| 日本久久影视| 天堂网成人| 欧美日本在线| 日韩精品小视频| 青青草伊人| 四虎永久在线精品网址| 亚洲91| 午夜激情免费| 亚洲精品mm1313久久| 午夜免费视频| 性视频网站在线| 偷窥福利视频| 人人香蕉| 欧美日韩网| 亚洲免费一区二区| 欧美深夜| 香港三级日本三级三级韩级2| 亚洲色图综合网| 香蕉久久ac一区二区三区| 亚洲欧美一区二区三区二厂| 香港三级日本三级妇人三级| 台湾佬自偷自拍情侣在线| 青青色在线观看| 日美一级毛片| 欧美精品人爱c欧美精品| 日本激情一区二区三区| 亚洲精品第一国产综合野| 亚洲乱码卡一卡二卡三永久| 天啪天干在线视频| 四虎影院久久久| 色尼玛亚洲| 亚洲高清色图| 午夜精品影院| 欧美色爱综合网| 色综合天天综合网国产国产人| 欧美日韩一二三区| 日本久热| 婷婷色一二三区波多野衣|