Engineering Technology: General requirements for inspection of steel structure engineering foundation

Time:[2015-1-14]  Hits:4346

Engineering Technology: General requirements for inspection of steel structure engineering foundation

     Steel installation before positioning axis response, infrastructure and elevation axes, bolt size and location of the building, such as review, and should be the basis for the handover inspection and acceptance. Such as anchor bolts required to review each bolt axis, elevation, to go beyond regulatory requirements, must take appropriate remedial measures. Such as increasing the size of the column bottom in the column base plate according to the actual location of re-drilling screws.
     When the transfer of basic engineering batches, each less than a handover acceptance column base can form the basis of the degree of spatial steel mounting unit and shall meet the following requirements: basic strength of concrete to meet the design requirements; tamp backfill around the foundation is completed; foundation the elevation and the datum axis signs and point accurate and complete; the top surface of the foundation should be flat base surface of the secondary should be watered at cutting hair, anchor bolts should be intact.
The column axis bomb test in place of the column base surface.
     The column base level for leveling. Pouring concrete column base elevation is generally reserved for 50 to 60 mm (compared with steel column base design elevation), the installation is a steel plate or take advance using slurry leveling boards.
     When using the steel plate to make the support plate, the steel plate in the area before the bottom of the column should be secondary grouting withstand tensile load and bolt tightening calculated and determined according to the following compressive strength of concrete foundation, columns soles of the feet. Base plate and the contact surface and the bottom surface of the column should be smooth, tight.
     When the syrup should be used to sit for the board using non-shrink mortar, mortar pad before lifting pillar strength should be higher than a grade basis of concrete strength and mortar pad area should be sufficient to meet the requirements of hosting.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 欧洲在线一区| 欧美在线不卡视频| 亚洲偷怕| 亚洲视频在线观看免费视频| 亚色综合| 青青青国产精品手机在线观看| 欧美日韩国产高清一区二区三区| 午夜日本一区二区三区| 亚洲成人www| 亚洲专区一路线二| 欧美日韩综合网在线观看| 亚洲天堂在线视频播放| 亚洲乱亚洲乱妇24p| 一级美国乱色毛片| 无码专区aaaaaa免费视频| 日本国产免费一区不卡在线| 欧美成人性色xxxxx视频大| 亚洲二区在线| 亚洲精品911| 亚综合| 青青在线视频观看| 青春草国产| 亚洲天堂伦理| 亚洲特黄视频| 欧洲一级鲁丝片免费| 日本视频免费高清一本18| 视频在线观看国产| 欧美激情亚洲| 亚洲成人网在线| 香蕉婷婷| 日韩国产在线观看| 青青草在在观免费福利线观看| 人妖专区视频在线播放| 欧美成人免费在线观看| 日韩快播网| 一级毛片在线播放| 亚洲欧美国产精品久久久| 亚洲午夜小视频| 日本欧美日韩| 青青热久| 日本映画ady9net|