Steel works construction schedule control content

Time:[2014-11-15]  Hits:5191

(1) pre-schedule control include: steel structure engineering controls to determine the construction schedule of work content and features, control methods and specific measures to achieve the objective analysis of the progress of risk presented problems to be solved; in accordance with the contract period, the construction schedule objectives and project staging production requirements of the construction preparation work and the timing of the construction tasks to determine the interface between the various units of construction engineering, engineering jobs and full-site engineering; the use of water construction principle, segmental construction of scientific organizations to achieve three-dimensional and assembly-line plane, while the application of network planning techniques, the preparation of the implementation of the local network plan, according to a key line of work to achieve continuity and balance construction; construction works in the project schedule as the basis of the total annual projects, identified steel the image of progress and structural engineering resources required (including manpower, material resources, materials, equipment and funds, etc.) supply plan.
(2) the matter of schedule control include: the establishment of the progress of implementation of the system construction steel structure engineering controls; timely construction progress inspection, make a record, keep abreast of the progress of the implementation of dynamic; the progress of data collection and statistical collation, and with compared schedule, which found that if there is progress and the progress of the deviation predicted feasible modifications measures; readjust schedules and related plans and implementation; enhance on-site construction management and scheduling, timely prevention and treatment occur in construction technical issues, quality incidents and accidents, reduce the impact of these issues on the schedule.
(3) after the schedule control include: the timely acceptance of tissue engineering, process engineering claims, project progress data compilation, classification, cataloging and archiving and so on.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 色婷婷狠狠久久综合五月| 欧美操| 亚洲成年人网| 亚洲成人看片| 一级不卡毛片免费| 欧美日韩激情一区二区三区 | 欧美精品亚洲精品日韩经典| 天堂av2014| 青青草国产精品久久| 日韩精品福利视频一区二区三区| 午夜在线成人| 特级全黄一级毛片免费| 亚洲国产中文字幕| 午夜视频网站| 青青操视频免费观看| 日韩不卡在线| 亚洲fuli在线观看| 亚洲国产精品嫩草影院久久| 亚洲狠狠婷婷综合久久蜜桃| 欧美高清第一页| 一级黄一片| 欧美一级成人一区二区三区| 日本aaaa级| 欧美日韩欧美| 色.www| 日韩色视频| 欧美精品福利视频| 人人澡人人爱| 亚洲黄色一区二区| 特级黄一级播放| 欧美亚洲另类国产sss在线| 夜夜久| 四虎影视4hu4虎成人| 亚洲黄色第一页| 日本a∨在线| 日韩特级毛片| 四虎com| 特级黄色网| 欧美一级在线看| 日本成人a| 色吧色吧|