日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > Mixed steel installation drawings and design changes
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn

Mixed steel installation drawings and design changes

Time:[2014-9-27]  Hits:4995

        Drawings should be carried out before the installation of steel joint hearing before the joint hearing of construction units should be familiar with and master design file contents, find the component mounting problems affecting the design and review with other professional engineering with inappropriate ways.
  
1 drawing Mixed

Before installation of steel structures, construction units in order to solve problems in a familiar drawing found during the technical problems and quality problems found in the drawings nipped in the bud, the parties participating in the construction drawings to conduct joint hearing.
Mixed content drawings generally include:
Qualification (a) meets the design units, drawings, whether by design unit officially signed.
(2) design units to do the design intent description and proposed process requirements, the main production unit introduces steel production process.
Have a contradiction between (3) professional drawings.
(4) between each drawing plane position, elevation, etc. are the same, mark whether the omission.
(5) the professional construction and construction procedures with or without problems.
Construction methods (6) Install the unit can meet the design requirements.

2 design changes

In the construction drawings before use, after use of design changes will occur due to the construction unit requirements, or changes in construction site conditions, or changes in national policies and regulations and other reasons caused. Design change for whatever reason, who proposed the construction unit must obtain the written consent and apply the change. There will schedule and cost impact of design changes, in strict accordance with the regulations should be implemented in order to clarify responsibilities and avoid claims event is not conducive to the construction.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 思思久久99热这里只有精品66| 天堂精品高清1区2区3区| 午夜视频免费国产在线| 日韩欧美亚洲一区| 亚洲成人看片| 午夜激情免费| 欧美一级日韩一级| 欧美一区二区亚洲| 天天在线免费视频| 亚洲精品乱码久久久久久蜜桃欧美| 亚洲精品九色在线网站| 日本一区二区三区久久| 亚洲九九九| 欧美在线一级精品| 日韩免费黄色片| 台湾佬中文综合| 日本阿v视频在线观看高清| 欧美黄区| 亚洲一区二区欧美日韩| 亚洲国产系列久久精品99人人| 日本欧美一区二区三区视频麻豆| 日韩精品福利视频一区二区三区| 一级毛片在线看在线播放| 一本久久综合亚洲鲁鲁五月天| 亚洲夜夜骑| 日美一级毛片| 日本高清精品| 日韩经典在线| 一级毛片免费在线播放| 性做久久久久久蜜桃花| 欧美福利一区| 日本三级网络| 欧美日韩在线看| 色国产精品一区在线观看 | 亚洲18卡通动漫在线播放| 亚洲国产小视频| 日日干天天操| 亚洲春色在线视频| 一本伊在人香蕉线观新在线| 亚洲观看视频| 一级毛片真人免费播放视频|