Problems needing attention in the process of steel structure construction

Time:[2022-8-29]  Hits:1937

The steel structure construction project has become more and more popular in recent years, and the problems to be paid attention to in the construction process are particularly important. Generally, many safety problems can be avoided only by the following points. Next, I'll talk to you.

 

First, the size of reinforcement holes shall be reserved before and after construction


In particular, the holes on the section steel can be as small as possible, so that the steel can have good strength. In addition, the loss of profile steel shall be reduced to facilitate construction. In addition, when drilling the steel structure, the two symmetrical sides of the reinforcement shall be taken into account. It is particularly noted that the edge of the reinforcement with a diameter greater than 25mm may increase the diameter of the reinforcement by 1 ~ 2mm.


Second, the position of reinforcement holes must be reserved in advance


When drilling, the upper, lower, left and right positions shall be aligned accurately, otherwise it will be very difficult to pass through the reinforcement. If the information of the construction party responsible for the construction of section steel is inconsistent with that of the civil construction party in the practice of steel structure construction, the two parties need to communicate in time during the construction process.


Third, installation details of bottom steel column


If the embedded steel column at the bottom is light, we can use machinery for lifting, and manual position calibration can be done. This has many advantages.


First, the accuracy of the mounting position can be ensured; Second, because the component processing plant has completed the foundation fabrication of the steel column, the center of the profiled steel column and the center of the base plate must be coincident during fabrication, so the corresponding outer contour is parallel; Third, use the tower crane or other auxiliary installation machinery to lift the foundation embedded column, and then slowly lower the foundation embedded column. In this way, the four corners of the column base plate are aligned with the contour line, and the base plate of the column base is on the mat. Striking while the iron is hot will save time and labor, and can greatly improve the progress of the steel structure construction.


In addition, we can calibrate the position of the foundation embedded column with the help of two theodolites. Then fix the two theodolites on the vertical and horizontal axes of the column, and then move the position of the column to make the front center line of the column coincide with the viewpoint of the two theodolites, which can ensure the verticality of the column.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 一本之道无吗一二三区| 亚洲欧美一区二区三区二厂| 亚洲综合色在线观看| 亚洲专区欧美| 外国黄色小视频| 日韩精品第二页| 欧美福利| 日韩一区二区免费视频| 欧美一区视频在线| 欧美日韩一区二区不卡| 午夜生活片| 人人揉揉香蕉| 四虎影视永久在线精品免费| 亚洲一区免费| 日本黄色三级网站| 欧美精品人爱c欧美精品| 亚洲人成一区二区三区| 青青青线在线观看| 全免费午夜一级毛片一级毛| 青草视频.com| 四虎com| 日本一本免费一二区| 性欧美xx| 香蕉97超级碰碰碰免费公| 无遮挡很爽很污很黄很色的网站| 欧美色久| 青青青青青青青草| 一级a爱片久久毛片| 三级网站| 三级黄色a| 四虎在线永久| 欧洲1区二区三区二页| 天天操天天干天天干| 日韩欧美区| 午夜视频精品| 日韩美女在线观看| 手机看片福利盒子久久| 日韩在线播放中文字幕| 亚洲综合自拍| 性夜影院爽黄a爽在线看香蕉| 亚洲自偷自偷图片在线高清|