Preparation for steel structure installation of prefab industrial buildings

Time:[2022-3-14]  Hits:2208

With the continuous development of economy, diversified architectural structures have entered our daily life. Develop prefabricated buildings such as prefabricated concrete structure, steel structure and modern wood structure according to local conditions. Steel structure prefabricated buildings are widely used in different types of fields such as industry, commerce, agriculture and so on. The fast installation method is conducive to the rapid completion of the industry and get a good development trend.

The contents and requirements of steel structure installation preparation of prefab industrial buildings are the same as those of ordinary steel structure installation works. During the construction of steel column foundation, the positioning and protection of anchor bolts shall be done well, and the top elevation of foundation and anchor bolts shall be controlled. After foundation construction, inspection and acceptance shall be carried out according to the following contents:

(1) Whether the axis position of each row and column is correct;

(2) Whether the span of each span meets the design requirements;

(3) Whether the elevation of foundation top meets the design requirements;

(4) Whether the position and elevation of anchor bolts meet the design and specification requirements.

Before the hoisting of components, the shape and section geometric dimensions of components shall be inspected according to the relevant provisions in the <<Code for construction and acceptance of steel structure engineering>> and the deviation shall not exceed the value specified in the specification; The components shall be numbered according to the requirements of the design drawings, highlighting the installation center mark. The center mark and elevation mark in two directions shall be popped up for the steel column; Mark the position of binding point; The length of the column should be measured, and the length error should be recorded in detail. It should be written on the plane beside the center mark of the lower part of the column with oil pen, so that it can be adjusted in the two grouting layer of the top elevation of the foundation.

Components entering the construction site must have quality assurance and detailed acceptance records; It shall be stacked in the designated area according to the type, model and installation sequence of components. Enough supporting surface shall be provided for the component stratum skid to prevent the fulcrum from sinking; When components of the same model are stacked, the fulcrum of each layer of components shall be on the same straight line; The deformed components shall be corrected in time and can be installed only after passing the inspection.

Following the contents of the specification, the construction party effectively prepares for installation and provides favorable conditions for the installation of the main steel structure of the prefab industrial buildings. For the construction of steel column foundation, implement the work details and do the work well, which is more conducive to the later installation of steel structure. The normal use of prefab industrial buildings is closely related to the installation preparation. Relevant construction party shall make preparations for the installation of prefab industrial buildings.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)
主站蜘蛛池模板: 丝袜毛片| 日本不卡免费高清一级视频| 香港经典aa毛片免费观看变态 | 亚洲成a人v在线观看| 欧美永久免费| 偷窥福利视频| 日韩视频在线观看视频| 亚洲页码| 日本免费一区二区三区a区| 日本www免费| 欧美天天| 日韩免费精品一级毛片| 亚洲国产精品嫩草影院| 欧美日韩福利视频| 亚洲国产欧美在线成人aaaa| 一级毛片在线完整免费观看| 亚洲精品视频免费看| 日韩国产欧美一区二区三区| 婷婷亚洲五月| 日本特黄特色| 欧美国产激情二区三区| 日本在线看小视频网址| 亚洲50p| 亚洲一区二区三区夜色| 天码毛片一区二区三区入口| 一级看片| 三级免费| 欧美日韩精品一区二区| 亚洲欧美日韩中文字幕网址| 色爱天堂| 亚洲欧美日韩精品在线| 亚洲一区欧洲一区| 天天草综合| 亚洲精品无码不卡| 日韩综合一区| 午夜影院在线观看视频| 四虎影视国产精品永久在线| 日本一区二区三区四区不卡| 污片在线看| 亚洲精品亚洲人成人网| 亚洲一区视频在线|