Main reinforcement construction methods of steel workshop building reinforcement

Time:[2022-2-17]  Hits:2206

The reinforcement of reinforced concrete structures has been seen a lot, but do you know how to do the reinforcement of steel structures? Where are the common steel workshop building reinforcements generally used? Common steel workshop building reinforcement is mostly used in cooling towers, steel workshop buildings, steel structure interlayers and other places.

The main methods of strengthening the steel workshop building are:

Reduce the load, change the calculation graphics, increase the cross-section and connection strength of the original structural members, and prevent crack propagation. When there is mature experience, other reinforcement methods can also be used.

The identified steel structures that need to be reinforced are generally divided into local reinforcement and comprehensive reinforcement according to the scope of damage. Local reinforcement is the reinforcement of a bar or connecting node with insufficient bearing capacity.

Comprehensive reinforcement is the reinforcement of the overall structure, there are two types of reinforcement methods without changing the structure static calculation graphics and changing the structure static calculation graphics. Adding or strengthening the support system is also an effective way to strengthen the structural system. The reinforcement method of increasing the original member section is the most expensive and labor-intensive method (but it is often a feasible method); the method of changing the calculation diagram is the most effective and diverse, and its cost is also greatly reduced.

The construction methods of the reinforcement structure of the steel workshop building are as follows:

Load reinforcement, unload reinforcement, and removal of parts that should be reinforced or updated from the original structure for reinforcement. The construction method for the reinforcement of the steel workshop building should be determined by the designer and the construction unit through consultation according to the user's requirements and the actual stress state of the structure, under the premise of ensuring quality and safety.

(a)Reinforcement with load: the construction is the most convenient and economical. It is used when the stress of the component (or connection) is less than 80% of the design strength of the steel, or when the component is not significantly damaged (broken, deformed, warped, etc.). At this time, in order to make the new reinforced rod participate in the force, sometimes it is necessary to take temporary unloading measures for the reinforced rod. In addition, care should be taken not to affect the normal use of other components during reinforcement.

(b) Unloading reinforcement: It is suitable for when the structural damage is large or the stress state of the components and connections is very high, and its load needs to be temporarily relieved. For some structures that mainly bear movable loads (such as crane beams, etc.), their movable loads can be limited, which is equivalent to most of the unloading.

(c) Remove the parts that should be reinforced or updated from the original structure: when the structure is severely damaged or the bearing capacity of the original section is too small, it must be reinforced or updated on the ground. At this time, temporary support must be provided to completely unload the replaced component; at the same time, the safety of the entire structure must be guaranteed after the replaced structure is removed.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 亚洲狠狠| 日韩在线播放中文字幕| 亚洲欧美一区二区三区在线观看| 日本大片久久久高清免费看| 三级黄色网址| 亚洲专区欧美| 亚洲国产精品va在线观看麻豆| 欧美日韩日本国产| 亚洲综合在线成人一区| 人人干人人草| 亚洲欧洲国产成人综合一本| 天堂网中文在线| 亚洲欧美另类在线视频| 午夜呻吟| 日本欧美韩国专区| 欧美日韩午夜精品不卡综合| 青青草狠狠干| 欧美日韩精品福利在线观看| 日韩高清成人毛片不卡| 青青成人福利国产在线视频| 亚洲毛片免费观看| 色综合图区| 亚洲一区二区三区精品影院| 亚洲精品国产字幕久久vr| 日本精品久久久久中文字幕| 亚洲国产精品自产拍在线播放| 日韩在线视频在线观看| 人人爱人人舔| 欧美精品久久久亚洲| 青娱乐中文字幕| 五月婷婷激情综合网| 亚洲盗摄| 欧美特黄a级猛片a级| 亚洲欧洲精品成人久久曰| 色性综合| 亚洲女同在线| 涩涩在线观看免费视频| 日产一区| 日韩高清不卡在线| 婷婷六月久久综合丁香一二 | 三级网址日本|