日本免费精品-日本免费精品视频-日本免费久久-日本免费久久久久久久网站-韩剧伦理在线-韩剧伦理在线观看

Language:CHINESESENGLISH

Home > News > FAQs
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sowiz.com.cn
Why timing roofing needs maintenance?
Why timing roofing needs maintenance? WHY why maintenance roofing needs timing? Foshan Steel Experience tells us: roofing needs 5-8 years to conduct a systematic overall view, maintenance or refurbishment intervals, this can effectively prevent damag...
2014/9/6
Prestressing steel reinforcement program
Prestressing steel reinforcement program [Problem] prestressed reinforcement steel student program? [Answer] prestressing steel reinforcement and construction technology program: Prestressing steel reinforcement program can be divided into two type...
2014/9/3
Multi-storey and high-rise steel column base grouting requirements
Multi-storey and high-rise steel column base grouting requirements [Student] multi doubt rise steel column base grouting and regulations? [Answer] In the first section of the frame after installation, calibration, bolt, that should be the bottom en...
2014/8/27
Steel construction?
Steel construction? 1, Foshan Steel system has a light weight, easy installation, short construction period, good seismic performance, contribution to recover faster, less environmental pollution and other comprehensive advantages, good ductility and...
2014/8/20
Features built steel structure analysis?
Features built steel structure analysis? Steel structure engineering technology uses Foshan Steel Works mainly in steel production, steel beams, steel columns, steel trusses and other components made ​​from steel and steel plate compositi...
2014/8/20
What are the characteristics of steel plant, composed of?
What are the characteristics of the steel structure plant, constitute? Foshan Steel plant refers to the use of steel and hot rolled, cold-formed or welded profiles made ​​by the convergence of convergence and transmission parts can with...
2014/8/20
FAQ steel welding process
FAQ steel welding disposal (B) the cold crack Generally refers to weld cold cracking during cooling down to the temperature changes in the temperature of martensite size (300-200 ℃ below) occurs, can be presented immediately after welding, and can ...
2014/8/16
Steel manufacture related test requirements?
Steel manufacture about experimental requirements? (1) Steel reinspection When the steel is one of the following conditions should be expected before processing the next reinspection: ① foreign steel imports; ② mixing different batches of steel ③ the...
2014/7/30
Control purposes tall buildings?
Control of high-rise building construction intentions? Foshan multi-layered steel high-rise buildings, the height of the large, high-rise buildings constructed in order to ensure the necessary rigidity Foshan Steel respond layer between the maximum d...
2014/7/26
The advantages and disadvantages of building steel plant?
Advantages and disadvantages of steel construction plant? Foshan Steel Advantages 1, widely use: apply to factories, warehouses, office buildings, stadiums, hangars and more. Both for single-large-span construction, can also be used to create a multi...
2014/7/26
Steel plant routine maintenance and upkeep of the building?
Construction of steel plant routine maintenance and conservation? 1, after we Foshan Steel plant installed on the owners concerned, can not be allowed to modify its structure, can not remove any of the bolts and other components, can not increase or ...
2014/7/26
Steel plant routine maintenance and upkeep of the building?
Construction of steel plant routine maintenance and conservation? 1, after we Foshan Steel plant installed on the owners concerned, can not be allowed to modify its structure, can not remove any of the bolts and other components, can not increase or ...
2014/7/19
page:13  1  2  3  4  5  6  7  8  9  10  11  12  13  14  pervious next  

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
主站蜘蛛池模板: 日本中文在线视频| 欧美国产日韩在线| 一级毛片在线直接观看| 亚洲欧美日韩中文字幕在线一| 特级a级毛片| 日韩另类视频| 性8sex亚洲区入口| 欧美一a一片一级一片| 五月天伊人网| 亚洲欧美综合日韩字幕v在线| 四虎影院免费在线| 青青青青久久国产片免费精品| 亚洲草逼视频| 亚洲精品国产自在久久老牛| 日韩视频在线观看视频| 欧美一区二区三区在线可观看| 日韩 视频在线播放| 人人插人人草| 亚洲综合色在线观看| 亚洲综合色网| 青青青亚洲精品国产| 午夜在线观看视频免费 成人| 亚洲精品成人a在线观看| 欧美成人精品免费播放| 欧美国产视频| 亚州综合| 日韩欧美91| 亚洲国产精品lv| 青青视频国产在线播放| 午夜精品久久久久久久99热| 亚洲香蕉伊在人在线观婷婷| 欧美视频在线观看免费最新| 欧美亚洲国产精品久久蜜芽| 亚洲第一毛片| 亚洲视频在线观看一区| 日韩欧美在线第一页| 色综合久久久久综合99| 亚洲欧美成人网| 一级毛片免费全部播放| 五月婷婷六月合| 色佬网|